Kondisi Pembangkit PLTGU MUSI II 22 November 2023
Kondisi Pembangkit PLTGU MUSI II 22 November 2023
Kondisi Operasi Mesin
GTG 1 = OFF (0-24)
GTG 2 = ON (0-24)
GTG 3 = ON (0-24)
STG = ON (0-24)
Monitoring All Power Plant Manggala
Kondisi Pembangkit PLTGU MUSI II 22 November 2023
Kondisi Operasi Mesin
GTG 1 = OFF (0-24)
GTG 2 = ON (0-24)
GTG 3 = ON (0-24)
STG = ON (0-24)
Kondisi Pembangkit PLTM Cibuni 21 November 2023
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = OFF (0-24)
Kondisi Pembangkit PLTM Endikat 21 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 13)
Turbine 2 = ON (0 – 12)
Turbine 3 = OFF (0 – 0)
Kondisi Pembangkit PLTM Lahat 21 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTU Baturaja 21 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Kondisi Pembangkit PLTGU MUSI II 21 November 2023
Kondisi Operasi Mesin
GTG 1 = OFF (0-24)
GTG 2 = ON (0-24)
GTG 3 = ON (0-24)
STG = ON (0-24)