Kondisi Pembangkit PLTU Baturaja 21 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. .Rakor Persiapan OH Desember 2023
  2. Cleaning area workshop
  3. Inspeksi All Weighing conveyor
  4. Inspeksi kompresor SULLAIR
  5. P/M Boiler & Turbin
    Penambahan oil block bearing IDF #2 & #4
    Pemasangan bak penampungan oil Sementara pada area dibawah flexible joint turbine #1.
  6. P/M WTP
    Perbaikan pipa bocor pada line R/O 1 B
    Pembuatan pintu tools box WTP
    Melakukan perawatan pompa suply UF, R/O, Demin dan cleaning areanya
  7. Fabrikasi Elbow doubling plate Part
  8. Continous Repair Compressor FEIHE #2
    Dismantling & Cleaning Air End Parts
  9. Repair kebocoran line transfer ash silo
    Area top mini silo

Elektrik

  1. Test inverter alat kalibrasi Belt conveyor weighing
  2. Lubrication motor motor induced fan dan feed water pump
  3. Rakor persiapan OH Desember 2023
  4. Pengecekan kabel power area coal handling

SPB
Mekanikal seal HP pump RO

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago