Kondisi Pembangkit PLTM Cibuni 24 November 2023
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = ON (0-24)
SPB
Nihil
Maintenance
Pembuatan pos standby bendung


Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = ON (0-24)
SPB
Nihil
Maintenance
Pembuatan pos standby bendung

