Kondisi Pembangkit PLTU Baturaja 23 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- Inspeksi All Weighing conveyor
- Inspeksi kompresor SULLAIR
- P/M TURBIN
Melanjutkan fabrikasi maintenance dact diatas water jet tank.
Flashing H/E feed pump - Cleaning scrap ex Install Elbow line transfer ash silo
- Inspeksi ESP hopper #5
- Repair kebocoran line Transfer Ash silo
- Repair kebocoran hopper transfer R/S to B/C #2
Elektrik
- Continue Check kontrol ESP Botol 5
- 2.Daily Parameter STG 2.
- 3.Continue chek protection grounding Mpb dan office
- 4.Continue repair Cctv gudang
SPB
Nihil










