Kondisi Pembangkit PLTU Baturaja 24 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- Inspeksi All Weighing conveyor
- Inspeksi kompresor SULLAIR
- P/M TURBIN
Melakukan Fabrikasi maintenance dact diatas water jet tank pump turbine #1 - P/M IDF
Melakukan pengecekan dan penambahan oil block bearing IDF #2 Dan #4 - P/M WTP
-Melakukan perakitan foot valve ex ponton - Repair ESP
Gasketing bottom screen Vessel #5
Gasketing F/V Vessel #2 - Repair kebocoran line Transfer Ash silo
- Fabrikasi Elbow doubling plate untuk line #3 & # 6 area tangga ESP.
Electrik
- Chek accu genset 75kw
- Chek dan perawatan penangkal petir chimney
- test dan perbaikan sensor level botol 5 Esp
- Daily maintenance
SPB
Nihil