Kondisi Pembangkit PLTM Cibuni 25 November 2023

Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = ON (0-24)

SPB
Nihil
Maintenance
Pembuatan pos standby bendung

Elektrikal

  1. Pemasangan PJU menuju bendung
  2. Pengaktifan commissioning sistem remot scada di kubikel Gh.

Pemasangan PJU arah bendung