Kondisi Pembangkit PLTM Lahat 26 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 17)
SPB
Nihil
Maintenance
Normalisasi bendung
perbaikan genset bendung
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 17)
SPB
Nihil
Maintenance
Normalisasi bendung
perbaikan genset bendung