Kondisi Pembangkit PLTM Cibuni 30 November 2023
Kondisi Pembangkit PLTM Cibuni 30 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Monitoring All Power Plant Manggala
Kondisi Pembangkit PLTM Cibuni 30 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Kondisi Pembangkit PLTM Endikat 30 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 20)
Turbine 2 = ON (0 – 20)
Turbine 3 = ON (0 – 20)
Kondisi Pembangkit PLTM Lahat 30 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 19)
Turbine 2 = ON (0 – 19)
Turbine 3 = ON (0 – 19)
Kondisi Pembangkit PLTU Baturaja 30 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Kondisi Pembangkit PLTGU MUSI II 30 November 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = ON (0-24)
GTG 3 = OFF (0-)
STG = ON (0-24)
Kondisi Pembangkit PLTM Cibuni 29 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Kondisi Pembangkit PLTM Endikat 29 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 14)
Turbine 2 = ON (0 – 11)
Turbine 3 = ON (0 – 17)
Kondisi Pembangkit PLTM Lahat 29 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 14)
Turbine 2 = ON (0 – 18)
Turbine 3 = ON (0 – 12)
Kondisi Pembangkit PLTU Baturaja 29 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Kondisi Pembangkit PLTGU MUSI II 29 November 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = ON (0-24)
GTG 3 = OFF (0-)
STG = ON (0-24)