Kondisi Pembangkit PLTM Lahat 29 November 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 14)
Turbine 2 = ON (0 – 18)
Turbine 3 = ON (0 – 12)

SPB
Nihil
Maintenance

  • Normalisasi bendung dengan 3 alat exca 330,320 dan 210
  • perbaikan/ pembersihan filter WCS 1,2 dan 3