Categories: PLTU BATURAJA

Kondisi Pembangkit PLTU Baturaja 4 Desember 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi & Cleaning room kompresor SULLAIR
  4. Prepare O.H
    Cek kebocoran valve dan pipa boiler
    Install selang untuk cleaning ESP #1
  5. Repair bocor line transfer Ash silo
    Area atas Vessel #6
  6. Install H/E feed pump #2
  7. Melakukan pengecekan dan perawatan pompa dan ponton
  8. Pemotongan material untuk repair casing IDF #2

Elektrik

  1. Pemasangan grounding ESP#1 setelah stop unit persiapan repair ESP#1
  2. Persiapan lighting OH
  3. Prepare hoist crane ESP#1

SPB
Nihil

Progress OH unit#1 PLTU Baturaja, 04 Desember 2023

  1. Stop Boiler#1 100 %
  2. Coolindown ESP, Boiler, dan drain debu ESP #1 On progress
  3. Stop turbin #1 100%
  4. Cleaning air cooler generator#1 On progress
Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago