Kondisi Pembangkit PLTU Baturaja 14 Desember 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24)
STG 2 = OFF

Maintenance
Mekanik

  1. Repair ESP #2
    r-epair Hopper No.4 5 6
    -Pasang siku untuk mencegah debu keluar saat hopper penuh
    -Repair deck isolator room
    -Repair kebocoran deck elektroda room :
    No.5 arah ESP 1 – MPB
    No.5 arah mes
    No.6 arah ESP 1
    -Perbaikan pin CP yang lepas
    -Reposisi CP pipa support yg bending
  2. Support tim electrik ganti valve motor steam blow DN 80 PN 100 Elv:32
  3. Melakukan perbaikan dan improvement jalur pipa udara pada sand filter #1
  4. Melakukan pengukuran diafragmant oil seal pada IDF
  5. Melakukan pengecekan dan perbaikan pada check valve vacoom turbine #2
  6. Flashing all H/E stage #2

Elektrik

  1. Suport subkon transformer #2
  2. Suport team mekanik
  3. Pengecekan transmitter level drumb boiler #2
  4. Setting ulang LS open close motor valve main steam blow boiler#2
  5. Suport lighting di super heater cyvlon elv. 26

• SPB

  1. Konsumable OH plate stell 4 mm 2 lembar

Progres OH unit #2 PLTU baturaja 14 desember 2023

Stop Boiler 2, 100 %

  1. Cooling boiler, ESP, drain debu ESP 2, 100%
  2. Cleaning ESP 2 (Drain), 100%
  3. Pengecekan Isolator dan Heater ESP 2 100 %
  4. Perbaikan Collecting Plate dan Elektroda, 80 %
  5. Perbaikan (penggantian) gasket manual valve Superheater Boiler #2 Elv. 32, 100%
  6. Perbaikan (penggantian) gasket manual valve Bypass MainSteam Boiler #2 Elv. 32, 100%
  7. Perbaikan (penggantian) manual valve venting MainSteam Boiler #2 Elv. 32, 100 %
  8. Pengecekan (perbaikan) Valve Steam Blow Boiler #2, 80%
  9. Pengecekan (perbaikan) sensor level Drum boiler 22, 80%
  10. Pengecekan Air Heater Boiler 2, 100%
  11. Cleaning Burner Boiler, 2, 100,%
  12. Cleaing Nozle Furnace Boiler 2, 100%
  13. Cleaing Nozle Solar Boiler. 0 %
  14. Start Boiler 2. 0%
    TURBINE
  15. Stop Turbine #2, 100%
  16. Pengecekan (Perbaikan) rembesan Oli Pilot Tranduser Turbine #2, 0%
  17. Pengecekan (penggantian) manual valve bypass Inlet Economizer di Elv. 7, 100 %
  18. Purifikasi & Perbaikan Trafo 20KV, 80 %
  19. Cleaning Oil Cooler 1&2, 50%
  20. Cleaning Air Cooler Generator 100%
  21. Start Turbine 2, 0 % TANPA PADAM UNIT
  22. Cleaning Sand Filter, 100 %
  23. Perbaikan Pondasi Ring Hammer, 75%

Additional work

  1. Repair deck plate area isolator Esp#2, 50 %

Leave a Reply