Kondisi Operasi Mesin
Turbine 1 = ON (0 – 15)
Turbine 2 = ON (0 – 23)
Turbine 3 = ON (0 – 19)

SPB
Nihil
Maintenance

  • normalisasi jaringan 33 kv yg tertimpa pohon di titik 588b- 589 di muara siban dan titik 610-611 di desa karang dalam.
  • penggalian pondasi tiang besi octagonal titik 738 muara siban