Kondisi Pembangkit PLTM Endikat 20 Desember 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 22)
Turbine 2 = ON (0 – 21)
Turbine 3 = ON (0 – 21)

SPB
Nihil
Maintenance

  • Row jaringan di section 3 dan section 4
  • penggalian pondasi tiang besi octagonal titik 738 muara siban

Leave a Reply

Your email address will not be published. Required fields are marked *