Kondisi Pembangkit PLTU Baturaja 21 Desember 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )

Maintenance
Mekanik

  1. Repair kebocoran line transfer Ash silo
    Area diatas Vessel #2
    Area Demin tank
  2. Repair Vessel tank No.1
    Ganti gasket F/V
  3. Penggantian scrapper Exavator mini
  4. Inspeksi Conveyor weighing
  5. Fabrikasi portal untuk area DCS 1 arah tambang
  6. Inspeksi kompressor SULLAIR
  7. Inspeksi gearbox rapping
    -Lubricating
  8. Melakukan fabrikasi maintenance dact vacoom valve turbine #2
  9. Melakukan Flasing H/E all feed pump

Elektrik

  1. Daily activities elektrik
  2. Perapian kabel power Dcs

SPB

  1. Konsumable WTP