Kondisi Pembangkit PLTM Endikat 5 Januari 2024

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 21)
Turbine 2 = ON (0 – 22)
Turbine 3 = ON (0 – 21)

SPB
Nihil
Maintenance
Lansir material batu split dan batu bujang untuk pengecoran tiang oktagolal dasa tj payang

Leave a Reply

Your email address will not be published. Required fields are marked *