Kondisi Pembangkit PLTM Cibuni 9 Januari 2024
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
SPB
Nihil
Maintenance
1.perapihan tutup kabel ditch