Kondisi Pembangkit PLTM Endikat 8 Januari 2024

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 23)
Turbine 3 = ON (0 – 23)

SPB
Nihil
Maintenance

  • perbaikan spacer hdpe di titik 563 – 564 desa tanjung payang
  • pengecoran pondasi tiang oktagonal di desa muara danau ( 334 )

Leave a Reply

Your email address will not be published. Required fields are marked *