Kondisi Pembangkit PLTU Baturaja 10 Januari 2024

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )

Maintenance
Mekanik

  1. nspeksi Weighing
    Lubiricating all rotary parts
    Cek splicing
    Cek hose power pack dumper #1
  2. Inspeksi kompressor Sullair
  3. P/M Ring hammer
    greasing all block bearing.
  4. Ganti carry roller B/C 1#B area bunker coal feeder
  5. Fabrikasi support manual valve cwp #1
  6. Melanjutkan install pipa jalur hydrolic pump CWP #1
  7. Flashing H/E feed pump
  8. Pengecatan maintenance dact vacoom valve turbine #2
  9. Melakukan pengecekan dan perawatan pompa dosing ammonia #1 dan #2

Elektrik

  1. Continue perbaikan hoise crane elv 14,5
  2. Penggantian lampu hopper weighing 1 dan 3
  3. Perawatan panel plc ESP
  4. perbaikan pressure gauge otlet cwp pump
  5. Daily maintenance

SPB
Nihil

Leave a Reply

Your email address will not be published. Required fields are marked *