Kondisi Pembangkit PLTU Baturaja 10 Januari 2024
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )
Maintenance
Mekanik
- nspeksi Weighing
Lubiricating all rotary parts
Cek splicing
Cek hose power pack dumper #1 - Inspeksi kompressor Sullair
- P/M Ring hammer
greasing all block bearing. - Ganti carry roller B/C 1#B area bunker coal feeder
- Fabrikasi support manual valve cwp #1
- Melanjutkan install pipa jalur hydrolic pump CWP #1
- Flashing H/E feed pump
- Pengecatan maintenance dact vacoom valve turbine #2
- Melakukan pengecekan dan perawatan pompa dosing ammonia #1 dan #2
Elektrik
- Continue perbaikan hoise crane elv 14,5
- Penggantian lampu hopper weighing 1 dan 3
- Perawatan panel plc ESP
- perbaikan pressure gauge otlet cwp pump
- Daily maintenance
SPB
Nihil