Kondisi Pembangkit PLTU Baturaja 8 Januari 2024

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )

Maintenance
Mekanik

  1. nspeksi ESP
    Cek Vessel #4
    Reposisi gearbox rapping No.5 ke No.4
    Ganti Gasket F/V No.6
  2. Inspeksi Weighing
  3. Inspeksi kompressor Sullair
  4. Cleaning
  5. Repair kebocoran line transfer ash silo
    Area top mini silo
    Area vessel #6
  6. Repair kebocoran ducting Hopper transfer B/C 1 A to R/S #A
  7. Melakukan perawatan all H/7. Melakukan perbaikan dosing pump biocide #2.
  8. Melakukan pengecatan jeep gantry

Elektrik

  1. Perawatan Panel Ring Hammer 1.a.
  2. Check Control Auto ESP, Botol 4.
  3. Perawatan greasing motor
  4. daily maintenance wtp area