Kondisi Pembangkit PLTM Lahat 10 Januari 2024

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 24)

SPB
Nihil
Maintenance

  • normalisasi bendung dgn menggunakan exca cat 330D dan 210 hitachi
  • lanjut pemasangan instalasi pipa (wtp)

Leave a Reply

Your email address will not be published. Required fields are marked *