Kondisi Pembangkit PLTM Lahat 12 Januari 2024

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 22)
Turbine 2 = ON (0 – 17)
Turbine 3 = ON (0 – 12)

SPB
Nihil
Maintenance

  • normalisasi bendung dgn menggunakan exca cat 330D dan 210 hitachi
  • perbaikan dan penggantian headed breaked pin wichat gate unit 3