Kondisi Pembangkit PLTU Baturaja 12 Januari 2024
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )
Maintenance
Mekanik
- Inspeksi Weighing
Reinstall hose hidraulic dumper weighing #1
Cek splicing - Inspeksi kompressor Sullair
- Repair hoist pasir Elv:21.0
Setting brake sistem - Repair kebocoran line transfer ash silo
- Install cover all manhole self alignment carry roller B/C #2
(Material : karpet talang air ) - Repair block bearing R/S untuk spare.
- Melakukan perbaikan H/E.
- Melakukan perawatan dan perbaikan pompa ponton.
- Fabrikasi dinding area repair CWP
Electrik
- Repair motor pompa ponton
- perawatan panel hidrolik CWP #1 outlet
SPB
Nihil