Categories: PLTU BATURAJA

Kondisi Pembangkit PLTU Baturaja 12 Januari 2024

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )

Maintenance
Mekanik

  1. Inspeksi Weighing
    Reinstall hose hidraulic dumper weighing #1
    Cek splicing
  2. Inspeksi kompressor Sullair
  3. Repair hoist pasir Elv:21.0
    Setting brake sistem
  4. Repair kebocoran line transfer ash silo
  5. Install cover all manhole self alignment carry roller B/C #2
    (Material : karpet talang air )
  6. Repair block bearing R/S untuk spare.
  7. Melakukan perbaikan H/E.
  8. Melakukan perawatan dan perbaikan pompa ponton.
  9. Fabrikasi dinding area repair CWP

Electrik

  1. Repair motor pompa ponton
  2. perawatan panel hidrolik CWP #1 outlet

SPB
Nihil

Muhammad Yusufi

Recent Posts

Office Moving Checklist: IT Infrastructure and Utilities

Moving an office can be a daunting task, particularly when it comes to managing IT…

28 minutes ago

Explorando el KYC en Stake en España: seguridad y beneficios para jugadores

En el mundo de los casinos en línea, la seguridad y la confianza son fundamentales…

1 hour ago

Тренди мобільних новин: формати для смартфонів

У сучасному світі, де смартфони стали невід'ємною частиною повсякденного життя, https://journalfocus.org.ua/ формати мобільних новин зазнають…

1 hour ago

Welke spellen vind je in de top 10 online casino’s van België?

Online gokken heeft de afgelopen jaren aan populariteit gewonnen, vooral in België. Met een breed…

1 hour ago

Пряма трансляція: правила роботи в екстремальних умовах

Пряма трансляція в екстремальних умовах є складним і відповідальним завданням, яке вимагає ретельної підготовки, знань…

2 hours ago

Moving to New State: Essential Documents to Update First

Moving to a new state can be an exciting adventure filled with new opportunities and…

2 hours ago