Categories: PLTU BATURAJA

Kondisi Pembangkit PLTU Baturaja 15 Januari 2024

Kondisi Operasi Mesin
STG 1 = ON (00.22 aampa )
STG 2 = ON (01.06 – 24 )

Maintenance
Mekanik

  1. Inspeksi Weighing
    Cek splicing
  2. Inspeksi kompressor Sullair
  3. Lanjut Repair power pack hydraulic plough tripperNo.1 B/C #3
  4. Repair vessel tank no.2 indikasi T/V macet.
  5. Repair kebocoran line transfer ash silo
  6. Melakukan repair kebocoran pengelasan pipa hydran
  7. Repair H/E feed pump untuk spare
  8. Flashing H/E feed pump

Elektrik

  1. chek panel mov turbin #1
  2. penggantian Selector Manual Adjust, ESP Botol 1,2,3 ESP #1
  3. Support mekanik lepas koneksi motor plogh tripper 1
  4. Perbaikan motor dumper boiler paf 2
  5. Daily motor ponton

SPB
Konsumable crusher

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago