Kondisi Operasi Mesin
STG 1 = ON (0 – 24)
STG 2 = ON (0 – 24)

Maintenance
Mekanik

  1. Inspeksi Weighing
    Cek splicing
  2. Inspeksi kompressor Sullair
    Setting parameter air dryer unit #1
  3. Lanjut Repair power pack hydraulic plough tripperNo.1 B/C #3
    Trial & Install
  4. Repair vessel tank no.4 indikasi shaft T/V bocor(Abrasi).
    Ganti Shaft
  5. Repair kebocoran bottom exhaust ducting boiler#2
  6. Melakukan perbaikan H/E untuk feed pump
  7. Flashing H/E feed pump

Elektrik

  1. Repair panel mov turbin #1
  2. penggantian Selector Manual Adjust, ESP Botol 4,5
  3. Support mekanik test motor plogh tripper 1
  4. continue Perbaikan motor dumper boiler paf
  5. chek auto light ash silo
  6. Chek valve purging air dryer kompressor
Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago