Kondisi Pembangkit PLTM Endikat 21 Desember 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 5)
Turbine 2 = ON (0 – 23)
Turbine 3 = ON (0 – 24)

SPB
Nihil
Maintenance

  • service rutin cat 320
  • penggalian pondasi tiang besi octagonal titik 738 muara siban

Leave a Reply

Your email address will not be published. Required fields are marked *