Kondisi Pembangkit PLTU Baturaja 26 Desember 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )

Maintenance
Mekanik

  1. Penggantian scrapper Exavator mini
    Fabrikasi
  2. Inspeksi Conveyor weighing
  3. Inspeksi kompressor SULLAIR
  4. Repair T/V No. 4
    Ganti seal shaft pneumatic actuator
  5. Repair Gearbox Rapping No.6
    Trial & Install
  6. Repair kebocoran line transfer ash silo
    area atas vessel #6
  7. Ganti return roller B/C #1A
    Area crusher room Elv: 14.0

Elektrik

  1. Suport perbaikan AC 20 KV
  2. Suport instal gearbox rapping #6 Esp #2
  3. Perapian kabel Ethernet fingerprint pos Office Pltu
  4. Penambahan instalasi power gudang PLTU
  5. Daily activities elektrik

SPB

  1. Konsumable elektrik maintenance