Kondisi Pembangkit PLTM Endikat 29 Desember 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 14)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 24)
SPB
Nihil
Maintenance
pengecekkan pipa penstock












Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 14)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 24)
SPB
Nihil
Maintenance
pengecekkan pipa penstock











