Kondisi Pembangkit PLTM Endikat 2 Januari 2024

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 18)
Turbine 2 = ON (0 – 15)
Turbine 3 = ON (0 – 18)

SPB
Nihil
Maintenance
penangan perbaikan tiang jaringan yg miring di desa tj payang

Leave a Reply

Your email address will not be published. Required fields are marked *