Kondisi Pembangkit PLTM Endikat 30 Mei 2023
A. Kondisi Operasi Mesin
Turbine 1 = ON (0 – 18)
Turbine 2 = ON (0 – 20)
Turbine 3 = ON (0 – 10)
Maintenance
-Nihil
SPB
-Nihil
Monitoring All Power Plant Manggala
A. Kondisi Operasi Mesin
Turbine 1 = ON (0 – 18)
Turbine 2 = ON (0 – 20)
Turbine 3 = ON (0 – 10)
Maintenance
-Nihil
SPB
-Nihil