Kondisi Pembangkit PLTU Baturaja 3 Januari 2024

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )

Maintenance
Mekanik

  1. Melakukan penambahan oil pada IDF #2 dan IDF #4
  2. Melakukan flashing pada H/E feed pump
  3. Melakukan Fabrikasi jeep gantry WTP
  4. Repair kebocoran pipa transfer Ashilo
  5. Repair tangki Ashilo plat deck room top jebol

Elektrik

  1. Perbaikan Alat Spektro WTP
  2. Perwatan Panel & Control PLC
    Crusher.
  3. Checking Instrument Ampere
    Parameter gland cooler turbine#2
  4. Instal power ac di room ccr
  5. Perbaikan trafo las 1 pasa
  6. Continue ganti lampu ruang miting dan teras office

SPB
Nihil