Kondisi Pembangkit PLTU Baturaja 13 Januari 2024
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )
Maintenance
Mekanik
- Inspeksi Weighing
Cek splicing - Inspeksi kompressor Sullair
Support vendor perawatan 2000jam unit #1
Cleaning - Repair power pack hydraulic plough tripperNo.1 B/C #3
Ganti rubber coupling
repair skirt rubber 1. - Repair H/E untuk spare H/E feed pump
- Cleaning area repair di CWP
- Flashing H/E feed pump
- Melakukan penambahan oil pada block bering idfan
- Abnormal ponton#1 cek dan repair
Elektrik
- .Perbaikan Control switch butterfly valve CWP 1.
- Perawatan Panel Switch Bunker DCS
- Charger accu genset Mpb
- Continue perbaikan hoise 14.5
- Daily dan perawatan maintenance
- Perbaikan main power office dan mess
- Abnormal motor ponton#1 cek dan repair
SPB
Nihil