Kondisi Pembangkit PLTM Lahat 14 Januari 2024

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = OFF (0 – 0)

SPB
Nihil
Maintenance

  • normalisasi bendung dgn menggunakan exca cat 330D dan 210 hitachi
  • pemasangan headed breaked pin wichat gate unit 3.

Leave a Reply

Your email address will not be published. Required fields are marked *