Kondisi Pembangkit PLTGU MUSI II 17 Juni 2023

Kondisi Operasi Mesin
GTG 1 = OFF
GTG 2 = ON (24 Jam)
GTG 3 = ON (24 Jam)
STG = ON (24 Jam)

Maintenance
-nihil
SPB
Impeller 2 unit dgn material Bronze dan Cast Iron no. PR : PDP/PR/20230616/0035/SO

Leave a Reply

Your email address will not be published. Required fields are marked *