Kondisi Pembangkit PLTM Lahat 23 Juni 2023

Kondisi Operasi Mesin
Turbine 1 = ON (24 jam)
Turbine 2 = ON (24 jam)
Turbine 3 = ON (24 jam)

Maintenance
Pembersihan pipa penstock

Greasing gear pintu penguras dan intake bendung

Perbaikan genset dongfeng bendung

Pembersihan water storage tank wcs 5


SPB
-Nihil

Leave a Reply

Your email address will not be published. Required fields are marked *