Kondisi Pembangkit PLTU Baturaja 26 Juni 2023

Kondisi Operasi Mesin
STG 1 = ON 24 jam
STG 2 = ON 24 jam

Maintenance
Elektrik :
1. Continue penggantian motor wjt 2 turbin 1
2. Chek kontrol motor roller screen 1a abnormal trip
3. Pemasangan kontrol speed turbin 2
Mekanik :
1. Continue suport pemasangan motor zetpump #2 turbin#1
2. Daily cek auxiliary coalhandling, ESP
3. Daily cek auxiliary boiler dan turbin
4. Kontinue prmotongan round bar
5. Perbaikan kebocoran jalur ESP
6. Pabrikasi frame untuk sampah MPB
7. Perbaikan dosing pump phosphate sampling room
8. Pengecekan roller roller screen A bagian belakang
SPB
Nihil