Kondisi Pembangkit PLTGU MUSI II 30 Juni 2023
Kondisi Operasi Mesin
GTG 1 = OFF
GTG 2 = ON (24 Jam)
GTG 3 = ON (24 Jam)
STG = Off
Maintenance
-Setting ulang travel valve ST 505, pergantian filter oli 505, pengganti gasket valve DN 100 dijalur main steam HRSG #1/(B#1) dan pengganti pipa autlet diameter 3″ di Fwp#4 yg bocor di area steam turbin.
SPB
Nihil
Dokumentasi
Proses pemotongan pipa 3″ di autlet feet weter pump#4



Proses pengencangan baut gate valve di jalur line pipa steam B#1

Penyambungan kembali pipa outlet FWP#4 di area ST.

Penggantian filter oli CPC 505


Kondisi CPC 505 st stlh dibuka.




Kondisi gasket Gate valve dia 4″ di main steam B#1