Kondisi Pembangkit PLTM Endikat 15 Juli 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-23)
Turbine 2 = ON (0-23)
Turbine 3 = ON (0-23)
SPB
Nihil
Maintenance
Pembersihan trash rack dan sediman di HP




Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-23)
Turbine 2 = ON (0-23)
Turbine 3 = ON (0-23)
SPB
Nihil
Maintenance
Pembersihan trash rack dan sediman di HP



