Kondisi Pembangkit PLTU Baturaja 8 Agustus 2023
Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)
Maintenance
Mekanik
- Continue instal drumb pully belt#1 B
- Continue instal FWP#3
- Repair kebocoran jalur Ashilo
- Continue pabrikasi portal baru
- Daily maintenance dan repair
- MCU hari kedua
Elektrik
- jadwal MCU
- support pengawasan pemasangan lampu dcs2
- Penggantian motor wjp turbin 1
- daily dan maintenance
SPB
Nihil
repair variable speed fluid coupling feed water pump #3

Repair drumb pully belt #2 Finish yang akan di instal di belt conveyor #1B

Drumb pully X belt conveyor #2 selesai di instal di Belt conveyor #1 B