Kondisi Pembangkit PLTU Baturaja 9 Agustus 2023

Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)

Maintenance
Mekanik

  1. Continue pabrikasi portal baru
  2. Lubrication Auxiliary Boiler & turbine 1&2
  3. Penggantian bering roller screen #B bagian belakang
  4. Pengisian oli fluid coupling FWP#3
  5. Pengecekan glend packing front & back pompa FWP#3
  6. Fabrikasi Exhaust fan workshop baru
  7. Daily maintenance & repair

Elektrik

  1. Support pemasangan lighting Dcs 2
  2. pemasangan impeler Wjt turbin 1
  3. penambahan power blower wc office
  4. continue test alat flow ultrasonic
  5. daily maintenance
  6. pabrikasi kabel tray kompressor baru

SPB
Nihil