Kondisi Pembangkit PLTM Lahat 26 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Turbine 3 = OFF
SPB
Nihil
Maintenance
Pengelasan bucket yg retak dam penambahan sim





Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Turbine 3 = OFF
SPB
Nihil
Maintenance
Pengelasan bucket yg retak dam penambahan sim