Kondisi Pembangkit PLTM Endikat 29 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-21)
Turbine 2 = ON (0-22)
Turbine 3 = ON (0-4)
SPB
Nihil
Maintenance
Pembersihan labirin unit 1





Cleaning wcs unit 1






Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-21)
Turbine 2 = ON (0-22)
Turbine 3 = ON (0-4)
SPB
Nihil
Maintenance
Pembersihan labirin unit 1





Cleaning wcs unit 1