Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)

Maintenance
Mekanik

  1. Install pipa drain manual to Wet Drain Mixer
  2. Repair kebocoran line transfer ash silo
  3. Repair gear box Rapping #4,#5,#6
  4. Fabrikasi Rak untuk di workshop baru
  5. Repair pompa ponton
  6. Repair Transfer Valve Vessel # 4
  7. Daily maintenance & repair

Elektrik

  1. Continue penggantian bearing wjt #1
  2. Continue perbaikan module acb crusher
  3. Continue perbaikan kontrol dust remover 3
  4. repair lighting esp romm
  5. daily maintenance

SPB
Nihil