Kondisi Pembangkit PLTGU MUSI II 26 Mei 2023

A. Kondisi Operasi Mesin
GTG 1 = ON (0-16)
GTG 2 = ON (8-24)
GTG 3 = ON (24 Jam)
STG = ON (24 Jam)

SPB
1.Ardrox 6367 jumlah 10 Pail ( PR 0030)
2.Revisi stabilius cushion jadi 20 set PR 0031
Regeant FE-HL SO 466 no. Pr 0028
3.Diff protect IDT8N
4.Zok27 Detergen
Info Tambahan
1.OH HRSG akan kita diskusikan di site
2.Vacuum Pump sedang pengurusan PO Forwarder Import, barang sudah ready
3.Control Valve dan sparepart sedang di proses procurement