Kondisi Pembangkit PLTU Baturaja 15 September 2023
Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)
Maintenance
Mekanik
- Cleaning workshop
- Repair kebocoran line transfer ash silo
- Lanjut pekerjaan pompa ponton
- Modifikasi DT Erlan u/ drain mini silo
-fabrikasi pintu belakang dan pasang terpal - Repair block bearing R/S (u/spare)
- Fabrikasi tambahan rack spare parts workshop
Elektrik
- continue greasing motor crusher dan kompressor
- chek dan perawatan panel ponton
- perbaikan lighting dan dispenser 20kv
- Daily maintenance