Kondisi Pembangkit PLTU Baturaja 27 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. Inspeksi ESP vessel tank #1
  3. PM. WTP
    Fabrikasi kerangkeng box panel COS dan panel Jansen
    Repair pintu Ponton dan pintu gerbang
    Cleaning screen foot valve & Y Screen
    Lanjut install paranet area cooling tower arah CWP
  4. PM. All pumps
  5. Repair kebocoran line transfer ash silo
  6. Fabrikasi rack spare parts logistic
  7. Inspeksi Weighing #1

Elektrik

  1. Terminasi couple kabel pltu ke COS
  2. pengelasan dudukan kabel pltu ponton
  3. Support optimalisasi hoist crane DCS
  4. Daily maintenance

SPB
Plate hardock 500 2500X6000xX600 ( pusat)

Leave a Reply

Your email address will not be published. Required fields are marked *