Kondisi Pembangkit PLTU Baturaja 28 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik & elektrik

  1. Suport subkon instal kompressor#2 sulair
  2. Suport subkon optimalisasi Hoist crane DCS#1 finishing trial
  3. Repair kebocoran jalur transfer Ashilo
  4. Pengecekan weighing#1, 2,3&4
  5. Pengecekan lock manhole boiler#1

Leave a Reply

Your email address will not be published. Required fields are marked *