Kondisi Pembangkit PLTU Baturaja 5 Oktober 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area work shop
- Inspeksi ESP
Watter drain buffer tank compressor SULLAIR - 3.Repair kebocoran line transfer ash silo
- 4.Prepaired Install Long Bow Ceramic Liner
-Jointing Ceramic Liner Pipe to Long Bow
-jointing flange - 5.PM WTP
-Rekondisi pompa ponton ( ganti bearing )
-Perawatan SC & SW Pumps - 6.Pembersihan area luar ruangan kompresor SULLAIR
Elektrik
- continue perbaikan penerangan area 14,5 Mpb
- Penambahan auto penerangan ponton
- Perapian Jalur Cable baru RJ komptr penyulang
- Cloning CPU Penyulang
- Chek baterai UPS schneider
- Daily maintenance