Kondisi Pembangkit PLTU Baturaja 5 Oktober 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance

Mekanik

  1. Cleaning area work shop
  2. Inspeksi ESP
    Watter drain buffer tank compressor SULLAIR
  3. 3.Repair kebocoran line transfer ash silo
  4. 4.Prepaired Install Long Bow Ceramic Liner
    -Jointing Ceramic Liner Pipe to Long Bow
    -jointing flange
  5. 5.PM WTP
    -Rekondisi pompa ponton ( ganti bearing )
    -Perawatan SC & SW Pumps
  6. 6.Pembersihan area luar ruangan kompresor SULLAIR

Elektrik

  1. continue perbaikan penerangan area 14,5 Mpb
  2. Penambahan auto penerangan ponton
  3. Perapian Jalur Cable baru RJ komptr penyulang
  4. Cloning CPU Penyulang
  5. Chek baterai UPS schneider
  6. Daily maintenance