Kondisi Pembangkit PLTM Lahat 6 Oktober 2023
Kondisi Operasi Mesin
Turbine 1 = On ( O – 19)
Turbine 2 = On ( O – 24)
Turbine 3 = On ( O – 5)
SPB
Nihil
Maintenance
- pebaikan alat pengukur kecepatan air.
- Normalisasi Downstream bendung.
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = On ( O – 19)
Turbine 2 = On ( O – 24)
Turbine 3 = On ( O – 5)
SPB
Nihil
Maintenance