Kondisi Pembangkit PLTM Endikat 28 Mei 2023
A. Kondisi Operasi Mesin
Turbine 1 = ON (24 Jam)
Turbine 2 = ON (24 Jam)
Turbine 3 = ON (0 – 4)
Maintenance
-Nihil
SPB
-Nihil
Monitoring All Power Plant Manggala
A. Kondisi Operasi Mesin
Turbine 1 = ON (24 Jam)
Turbine 2 = ON (24 Jam)
Turbine 3 = ON (0 – 4)
Maintenance
-Nihil
SPB
-Nihil